info@instantcovingsystems.com.au | 1300 365 165
Preparation
Clean flooring and wall – Remove all surface laitance, contaminants, and any weak or loose materials.
Installation
Measure length of wall to cover to determine cuts. Coving comes in 3m lengths. Anything shorter is to be measured and cut to size.
How to cut: either by drop saw (power) or coping saw (hand tool)
Corners: For any corners, use the mitre box to determine the internal and external angles.
Before fixing with Instatape or Instaglue, wipe the rear and underside of Instacove™ with Xylene (sourced from Bunnings) to remove any dirt and contaminants.
Apply Instatape or Instaglue to back of the coving back and base
If using Instaglue, place Instacove™ in installed position and press firmly.
If using Instatape, place Instacove™ in installed position, remove backing tape and press firmly.
Tips:
Leave a small (eg 3mm) gap between joins of corners and lengths and fill with Instaglue. Apply a small bead to top and bottom to achieve a complete seal. Smooth off excessive Instaglue with cloth and soapy water.
AFTER:
If overcoating the Instacove™,
Correct preparation is essential to achieve good adhesion
Wipe Instacove™ surface with Xylene
Abrade Instacove™ surface with 100 grit sandpaper
Trial sample area first to test for adhesion
Instant Coving Systemss are proud to partner with local businesses who value quality and innovation. See our products on display at a location close to you.